Pool demolition and construction


Click the images for a larger view
Before project starts (146kb) Removal  of existing pool (149kb) Excavation (164kb) removal (136kb) demolition (161kb)
pool completely removed (156kb) Excavation for the new pool (153kb) excavation (128kb) Gravel, Steel & Plumbing (146kb) Gravel, Steel & Plumbing (175kb)
1/2 inch steel Rebar sits on bridging (163kb) literally, tons of steel reinforcing bar are used on this pool (175kb) Spraying Gunite walls - 12 inches thick (150kb) closer image of spraying walls (132kb) the steps and floor are added (145kb)
The floor is a minimum of 8 inches thick (110kb) End fo the Gunite day..... sprayed over 80 yards of shot-crete (105kb) Tile is completed and gravel fill for around pool (135kb) coping above the tile is finished (190kb) backfill around the pool is complete, Concrete deck started (130kb)
White Marcite Finish is applied over the gunite (153kb) White Marcite Finish is applied over the gunite (143kb) White Marcite Finish is applied over the gunite (146kb) Filling the pool from a water truck (100kb) slide (127kb)
The slide pumps over 80 gallons of water per minute (78kb) finished pool (116kb) finished pool (152kb) finished pool (131kb)